Designed. Manufactured. Delivered.
Five Decades of Hydropower Engineering
Founded in 1975, ENERGOREMONT Plovdiv has built nearly five decades of experience in engineering, manufacturing and rehabilitation of hydro-mechanical equipment.
Operating from a purpose-built 3,500 m² production facility commissioned in 1987, we provide complete in-house capabilities for heavy machining, fabrication, assembly and modernization of large-scale components.
Our combination of engineering expertise, manufacturing capacity and field experience makes us a trusted partner for hydropower projects in Bulgaria and abroad.
Production Facility
Engineering & Manufacturing
Trusted Partner
Our Products
Hydro Turbines and HPP Equipment
Manufacturing and servicing of hydro turbines with capacities from 10 kW to 10 MW, as well as complex hydrotechnical facilities.
Hydro Turbines
Pelton turbines
Francis turbines
Pit Francis turbines
Cross-flow turbines
Shut-off Valves
Butterfly and cylindrical valves
Spherical valves
Synchronous valves
Dismantling joints and compensators
Production Capacity
Heavy Machining Capabilities
Our production facility in Belovo is equipped for machining large-scale components, making ENERGOREMONT a trusted partner for hydropower and heavy industrial projects.
Up to 100 t
Weight of processed component
Up to 10 m
Maximum diameter/length
Key Equipment
Vertical Turning Lathe SKY 50-100
For precise machining of rotational components with extra-large diameters
Horizontal Lathe SIU 250
Designed for machining long and heavy turbine shafts and axles
Boring Machine W200 HC
Multifunctional machine for complex milling and boring of housings
Trusted by Industry Leaders
We have carried out repairs and rehabilitation of almost all HPPs in Bulgaria, as well as large-scale projects in North Macedonia and for leading industrial enterprises.